![]() ![]() The measured results of the calculation are 1.949.132,91 tons of coal, in the SR 15 pit area 9.92 Ha obtained reserves of 84.075, 13 tons of coal and overburden volume 1.270,539,44 Bcm, on SR 17 the pit area was 15,04 Ha and mine reserves were 138.966,26 tons and overburden volume was 2.387.242,30 Bcm, on SR 20 the pit area was 24,87 Ha, and mine reserves were 291.314,81 tons and overburden volume 5.867.208,26 Bcm. The width of the slope is 5 meters with an overall slope of 450. ![]() Based on the geotechnical recommendations from PT.EBH, the planned single slope geometry is a 10 meter level height, 650 slope for sidewall and highwall and 300 slope for lowwall. The ultimate pit design alternative is needed in accordance with the economic prices so that alternative alternatives in some SR scenarios are 15, 17 and 20. Perhatikan dan jangan terburu-buru untuk menginstall terlebih dahulu. Perhatikan secara seksama bahwa ada 3 folder utama yaitu Exceed 9, Minesite dan Minescape 4.1.1.8 itu sendiri. Runge Indonesia, the rest is the selling price of coal which is not yet in line with current coal prices. Baik langsung saja bagaimana cara instal minescape di windows 10 64 bit : 1. Currently the company has compiled a pit design with SR 1: 22 parameters which are assisted by a consultant PT. Energi Batu Hitam in Muara Lawa and Siluq Ngurai, West Kutai, East Kalimantan. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |